Requirements for the installation of buried sewage treatment equipment
Category:
Time of issue:2019-12-30
As a type of equipment with excellent water purification effects, buried wastewater treatment equipment has many advantages in use. Therefore, in order to better exert its working effect, it has many requirements in design, production, installation, and operation, all of which require us to understand more. So, let's first understand its installation requirements below.
1. According to the equipment installation drawing and foundation drawing, prepare the foundation according to the size of the installation plan drawing, make a concrete base plate, and the foundation requires average pressure. 5t/m2 The foundation must be level, and installation can only be carried out after the curing period of the concrete foundation. If the equipment is installed below the ground floor, the relative elevation of the foundation from the ground floor shall be in accordance with the drawing dimensions, and the excavation width and length around shall be away from the foundation line. 500mm Above, for pipeline installation.
2. The pipeline installation and connection should be considered when the equipment is in place, and then according to the equipment's self-weight in the manual, cooperate with the crane tonnage, the installation order should be in place according to the on-site comparison diagram, the position and direction of the cylinder body cannot be wrong, and the spacing between them must be correct.
3. According to the installation drawing, connect the pipeline. After the equipment is in place, connect the pipeline with rubber pads to ensure that the connection does not leak.
4. After the buried wastewater treatment equipment is installed, it should be connected and fixed to the foundation floor to prevent the equipment from floating. At the same time, wastewater should be injected into the equipment (if there is no wastewater, use other water sources or tap water instead), and the filling degree must reach 70% Above, to prevent the equipment from floating. At the same time, check whether each pipeline leaks. The test water at each pipe outlet must not leak, and the equipment will not be displaced or tilted due to the rise of ground water.
5. After the buried wastewater treatment equipment is installed without any problems, the soil can be filled into the gaps around the equipment and compacted, and the ground can be leveled. When filling the soil, pay attention to the equipment manhole cover should be higher than the ground floor. 50mm About; the air inlet on the manhole cover cannot be blocked by soil.
6. Connect the control line of the electrical control cabinet to the equipment. When connecting the wires, pay attention to the direction of the underwater aerator and submersible pump motor. If the basement control cabinet is placed in a ventilated place, keep it dry, and generally, the control cabinet cannot be placed outdoors. It should be protected from sun exposure and rain to prevent leakage and burning of the control board and wiring terminals.
7. Pay attention to the equipment installation drawing and pipeline connection drawing, and connect according to the standard connection and plane layout. If the user requires, it can be arranged arbitrarily, but it must be proposed during the contract signing.
8. Connect the blower and pump control lines, and pay attention to the correct direction of the blower and pump. To ensure the smooth progress of the treatment work, the importance of its installation cannot be ignored.
The above are the requirements that personnel should pay attention to after mastering the correct installation method of buried wastewater treatment equipment. Following these requirements to complete the installation work will be smoother, and the working effect of the installed equipment will be better, so it cannot be ignored. However, in addition to this, we should also pay more attention to the equipment installation site selection and construction environment, and relevant requirements should also refer to the above content for implementation.
Tags:
-- Recommended --
Shijiazhuang Tianwang Environmental Protection Technology Co., Ltd.
Shijiazhuang Tianwang Environmental Protection Technology Co., Ltd. is a high-tech enterprise specializing in the research and development, manufacturing and sales of water treatment equipment.
Contact Information
Production address: No. 9, Fengchan Road, Economic and Technological Development Zone, Shijiazhuang City
Office Address: 25th Floor, Block C, No. 310 Changjiang Avenue, Shijiazhuang High-tech Development Zone
Contact Number:
0311-89272359 0311-68039237
Enterprise Email:
twhbkj@163.com
Website: en.sjztwhb.com